Inspector's at the gate.Is that clearance right?

Install-phase answers for data-center electrical crews — cited to the code article and the manufacturer guide.

AskWhiz

AskWhiz — Electrical

online

Working clearance in front of this 480V switchboard — what do I need?
09:41
Working clearance — NEC 110.26 480V falls in the 151–600V row of Table 110.26(A)(1): • Condition 1 — 3 ft • Condition 2 — 3 ft 6 in • Condition 3 (exposed live parts both sides) — 4 ft Width: 30 in or equipment width, whichever is greater. Doors must open 90°.

NEC Table 110.26(A)(1) — verify in your code book

09:41
Busway & PDU commissioning
Busway & PDU commissioning
Grounding, bonding & Cadweld
Grounding, bonding & Cadweld
Your submittals, in the field
Your submittals, in the field
The gear you install, documented.

The gear you install, documented.

Schneider/Square D, Eaton, ABB and Siemens switchgear — plus Vertiv, APC and Starline for data-center power. Pilot firms add their own submittals and specs, so answers are job-specific.

Schneider / Square DEatonABBSiemensVertivAPCStarline

Corpus in build — pilot firms shape what goes in first.

The Electrical bot on AskWhiz

Pilot now open

The electrical pilot runs 60 days — we're accepting up to 10 companies right now. WhatsApp or iMessage, with your own submittals, specs and single-lines ingested so answers are job-specific.

Frequently asked questions

Labor is the #1 risk on the job. Answer it in seconds.

Join the 60-day pilot