Inspector's at the gate.Is that clearance right?
Install-phase answers for data-center electrical crews — cited to the code article and the manufacturer guide.
AskWhiz — Electrical
online
Working clearance in front of this 480V switchboard — what do I need?
09:41Working clearance — NEC 110.26
480V falls in the 151–600V row of Table 110.26(A)(1):
• Condition 1 — 3 ft
• Condition 2 — 3 ft 6 in
• Condition 3 (exposed live parts both sides) — 4 ft
Width: 30 in or equipment width, whichever is greater. Doors must open 90°.
NEC Table 110.26(A)(1) — verify in your code book
09:41



The gear you install, documented.
Schneider/Square D, Eaton, ABB and Siemens switchgear — plus Vertiv, APC and Starline for data-center power. Pilot firms add their own submittals and specs, so answers are job-specific.
Schneider / Square DEatonABBSiemensVertivAPCStarline
Corpus in build — pilot firms shape what goes in first.
The Electrical bot on AskWhiz
Pilot now open
The electrical pilot runs 60 days — we're accepting up to 10 companies right now. WhatsApp or iMessage, with your own submittals, specs and single-lines ingested so answers are job-specific.
Frequently asked questions
Labor is the #1 risk on the job. Answer it in seconds.
Join the 60-day pilot
